The boat is mechanically in top condition.
Work performed in 2024:
- Replacement of the VULKAN ZF 325 1 A couplings (QSM11)
- Complete overhaul of the engines
- Removal and cleaning of the 5 engine + group heat exchangers
- Removal and inspection of the turbos
- Removal and replacement of the exhaust support bars
Annual maintenance: February 2025.
Hull maintenance scheduled for April 2025.



